Mayer-Osborn elevator contract proposals are preserved at Wauneta, Nebraska

Much of the time on the road was spent marketing. William Osborn at the wheel

William Osborn at the wheel. Much of his time was spent selling elevators to prospective buyers.

Story by Kristen Cart

The Mayer-Osborn Construction Company built their elevators from 1949 until about 1955. To do this, they had to beat out a number of formidable competitors, both large and small, vying for the same jobs. But they did not win the contract every time they tried. One example of their perseverance survives at the Frenchman Valley Co-op at Wauneta, a town in southwestern Nebraska. Mayer-Osborn did not win their bid, but their contract proposals, made over a period of several years, are still kept in the co-op vault among blueprints and records spanning almost 70 years.

The cover letter for the Mayer-Osborn contract proposal at Wauneta, Neb.

The cover letter for the Mayer-Osborn contract proposal at Wauneta, Neb.

When I was first trying to get a handle on the scope of Mayer-Osborn’s business, I asked my dad, Jerry Osborn, which partner did most of the marketing. I was under the mistaken impression that Eugene Mayer was in charge of all that, and I thought that all my grandfather William Osborn had to do was show up and start pouring concrete.

“No,” Dad said, “Gene Mayer took care of the office and accounting, but your grandpa did a lot of the sales.”

This ad for Mayer-Osborn Company ran in Farmers' Elevator Guide over a period of several years in the early 1950s.

This ad for Mayer-Osborn Company ran in Farmers’ Elevator Guide over a period of several years in the early 1950s.

Grandpa put many miles on his cars, visiting prospective clients, when he was not supervising an active construction site. He spent almost all of his time on the road. Dad recalls that he and his mother were home alone during those years, while his brother Dick was in Korea and his sister Audrey was married. We have a few pictures of Dad with both of his parents, but they were taken at a job site. The sales part of Grandpa’s job took much more effort than I had ever imagined.

For a closer look at the Mayer-Osborn plans for Wauneta, Neb., and the final outcome of their efforts, stay tuned.

Concrete problems plagued consecutive elevator projects at Blencoe, Iowa

DSC_0578Story and photos by Kristen Cart

In the summer of 1954, Mayer-Osborn Construction built an elevator with a stepped headhouse in the northwestern Iowa town of Blencoe. As my dad, Jerry Osborn, explained, after the crew poured the first ten feet of concrete in the slip-form process, the concrete sides below the forms showed signs of crumbling. An investigation revealed that the concrete mixture had not been set correctly. It took as many hours to remove the concrete and start over as it did to pour it. Dad worked on the project and saw the fallout first hand.

The larger Tillotson elevator stands to the left. The Mayer-Osborn elevator obstructs the view of its large annex which extends behind it.

The larger Tillotson elevator stands to the left. The Mayer-Osborn elevator on the right serves a large annex which extends behind it. Photo by Kristen Cart

Builders were required to do a destructive test on the concrete mix at various stages of curing, to ensure the proper strength for each part of the elevator structure. Engineers tested various mix ratios to decide upon the best one. Naturally, this process was used at Blencoe, but when the mix was finally set and the pour began, it was done incorrectly. I can imagine the blue language wafting from the site as the concrete was taken down. Someone on the site had his ears pinned back pretty fiercely. But the construction continued, and a handsome elevator still stands there today, nearly 60 years later.

Not until this year, when Tim Tillotson located the Tillotson company records and photographs, did we discover that Tillotson Construction of Omaha faced a similar problem as they built their elevator nearby about a year later. This time, the error was not caught as early, and the consequences became immediately apparent.

Tim Tillotson said he thought the blowout happened in about 1955. Whether Tillotson Construction did the repairs and completed the project, or whether another contractor was brought in, is not known to me, but I hope to revisit the site later this year and learn more. The image below is a rare one. It is amazing that photographic evidence survived, serving as a cautionary note, lest any builder were to become overconfident.

Blencoe_blowout-1 copy

This company photo shows the blowout. On the right the completed Mayer-Osborn elevator may be seen.

Errors were a constant threat in this business. In the best cases, they manifested themselves in embarrassing delays, in the worst, they incurred expensive lawsuits or physical harm.

Tillotson Construction and Mayer-Osborn both recovered from their respective forays into bad concrete and lived to build again, leaving handsome and serviceable elevators at Blencoe and elsewhere. The lessons they learned were priceless.

A chance encounter with a Tillotson elevator in Jamestown, Kansas

DSC_0057

Sporting a fresh coat of paint, the trademark Tillotson elevator with its curved headhouse still operates. 

Story and photos by Kristen Cart

On our last elevator road trip, which our family embarked upon in October 2012, we visited many of our grandfathers’ elevator projects from the 1940s and 50s. But we also amassed a photo collection of elevators we could not place. Either the grain cooperatives were closed for business on a Sunday, or the elevators were retired, or we didn’t have time to stop for an interview. So the photos languished for most of a year, until Ronald Ahrens and I could identify them, even though we strongly suspected that the structures were the works of one of our grandfathers.

One of the mystery elevators was a pure white example, located in the north-central Kansas town of Jamestown. Ronald’s uncle, Tim Tillotson, recently handed us the Omaha builder’s construction specifications, which finally identified this handsome elevator as a project built in 1953 by the Tillotson Construction Company.

A smaller elevator stands on a branch of the rail line. It's builder is unknown.

A smaller elevator stands on a branch of the rail line. It’s builder is unknown.

The Jamestown elevator stands not far from a companion elevator, rising alone on a fork of the railroad track. The smaller elevator was built in a straight-up style that predates the more common Tillotson style, and it’s provenance is unknown. It is reminiscent of the style of the elevator built by Tillotson Construction in Greenwood, Neb., but without the curved headhouse. But it also recalls several Chalmers and Borton examples.

It is our good fortune to have the detailed specifications for the Jamestown elevator. Thanks to the Tillotson Company’s meticulous record keeping and the decades-long survival of the records, we can share the construction details of this remarkable structure. The specifications, for the engineering-minded among our readers, are presented below.

Capacity per Plans (with Pack) 155,320 bushels

Capacity per foot of height 1581 bushels

Reinforced concrete/plans (Total) 1530 cubic yards

Plain concrete (hoppers & liner) 17 cubic yards

Reinforced steel/Plans (includes jack rods) 69.38 tons

Average steel per cubic yard of reinforced concrete 90.6 pounds


Steel & reinforced concrete itemized per plans

Below main slab 4260 lb/52 cu yd

Main slab 19,427 lb/160 cu yd

Drawform walls 89,400 lb/1107 cu yd

Work & driveway floor (including columns) 1997 lb/18.5 cu yd

Deep bin bottoms 5236 lb/28.5 cu yd

Overhead bin bottoms 3175 lb/24 cu yd

Bin roof & extended roofs (or corner) 5139 lb/37.4 cu yd

Scale floor (complete) 292 lb/4.8 cu yd

Cupola walls 4897 lb/52.5 cu yd

Distributor floor 1530 lb/11 cu yd

Cupola roof 2207 lb/14 cu yd

Miscellaneous (boot, leg, head, track sink, steps, etc.) 1205 lb/20.3 cu yd (excluding track scale)

(At the head of the column on the next page, the Jamestown elevator was described thus: “Clifton Imo plan; Like Meno but split dust bin for Bin #17”)


Construction details

Main slab dimensions (Drive length first dimen.) 54 x 51 feet

Main slab area (actual outside on ground) 2625 square feet

Weight of reinforced (total) concrete (4000#/cu yd + steel) 3130 tons

Weight of plain concrete (4000#/cu yd) 34 tons

Weight hopper fill sand (3000#/cu yd) 684 tons

Weight of grain (at 60# per bushel) 4660 tons

Weight of structural steel & machinery 18 tons

Gross weight loaded 8526 tons

Bearing pressure 3.25 tons per sq ft

Main slab thickness 21 inches

Main slab steel (bent) 1 in diameter at 7 inch o.c.

Tank steel at bottom (round tanks) 0.5 inch diameter at 12 inch o.c.

Lineal feet of drawform walls 514 feet including exterior

Height of drawform walls 120 feet

Pit depth below main slab 15 feet 9 inches

Cupola dimensions (outside W x L x Ht.) 22.25 x 42.5 x 26 feet

Pulley centers 152.66 feet

Number of legs 1

Distributor floor Yes

Track sink Yes

Full basement Yes

Electrical room Yes

Driveway width–clear 13 feet

Dump grate size 2 @ 9 feet wide

Columns under tanks size 16 inches square

Boot — leg & head Concrete

(The remaining specs were noted “same as Meno.” The Meno specifications are given below.)

Machinery Details

Head pulley 72 x 14 x 4 7/16 inches

Boot pulley 72 x 14 x 2 3/16 inches

R.P.M. head pulley 42 rpm

Belt 14 inch 6 ply Calumet

Cups 12 x 6 inch at 9 inch o.c. Howell

Head drive 40 horsepower

Theoretical leg capacity (cup manufacturer rating) 7500 bushels per hour

Actual leg capacity (80 percent of theoretical) 6000 bushels per hour

Horsepower required for leg (based on above actual capacity plus 15 percent for motor) 27.75 hp

Man lift 1.5 horsepower Ehr

Load out scale 10 bushel Rich

Load out spout 10 inch W.C.

Truck lift 7.5 horsepower Ehr.

Cupola spouting 8.25 inch W.C.

Truck lift 7.5 horsepower Ehr

Dust collector system Fan → Bin

Cupola Spouting 10 inch W.C.

Driveway doors Two overhead rolling

Conveyor Not required

(Items below were listed for Meno; it is not clear whether these were also built at Jamestown)


Also Built

60 foot 50 ton scale: 40 cu yd

2 sk’ing spts (scaffolding supports?)

J. H. Tillotson, Contractor, built their elevator scale houses with distinctive flair

The scale house at Monument, Kan., above, is almost identical to the one at Lodgepole, Neb.

The details of the scale house at Monument, Kan., above, are almost identical to those at Lodgepole, Neb. Photo by Kristen Cart

Story by Kristen Cart

Elevator construction was driven by stringent engineering requirements, lending a degree of commonality to the buildings. A few distinguishing details could be noticed, but from a distance you would be hard pressed to determine the builder. When contractors built the accompanying buildings, however, they had free reign to build in a style they could call their own. Often the scale houses would be instantly recognizable.

Lodgepole, Neb.

Lodgepole, Neb. Photo by Kristen Cart

J. H. Tillotson’s designs lent themselves well to the addition of a stylish scale house built alongside the main elevator. In some cases, when visiting an elevator, our access was limited. Then the lines of the scale house would be the only clue that we were looking at a J. H. Tillotson elevator.

Below are a few examples, each adapted to its individual setting, but each showing some distinguishing details that were common to all. Each J. H. Tillotson scale house was built of concrete, with a rectilinear floor plan. Usually they incorporated a protruding bay window, on the side facing the scale, for added visibility. Stairs, usually with steel railings, led to a door to accommodate truckers’ entry into the building. Carefully executed details in the concrete expressed the architect’s personal sense of style.

The scale house at the now demolished elevator at McAllister, Kan., is the only clue we have to its builder. Photo by Gary Rich

The scale house at the now demolished elevator at McAllaster, Kan., is a clue to its builder. Photo by Gary Rich

The scale house at Bradshaw, Neb. sports new siding over its concrete walls. Photo by Kristen Cart

The scale house at Bradshaw, Neb., sports new siding over its concrete walls. Photo by Kristen Cart

The scale-house at the Farmers Co-op, Daykin, Neb. shows characteristic corner details. Photo by Kristen Cart

The scale house at the Farmers Co-op, Daykin, Neb., shows characteristic corner details. Photo by Kristen Cart

While the builder of the elevators at McAllaster and Bradshaw has not been established with certainty, a fair case can be made that they were J. H. Tillotson designs based on details of the elevators themselves, the driveways, and the scale houses, when compared with known elevators. The scale house at Daykin, Neb., is included here for comparison.

J. H. Tillotson’s designs were visually appealing, with scale houses that contributed to a harmonious whole. When considering a builder, buyers would judge the quality of the elevator by its beauty, among other things. In this regard, J. H. Tillotson, Contractor, was more successful than most.

Scale houses express graceful utility, epitomize contemporary style

Daykin, Neb. scale house built by J. H. Tillotson, Contractor

Daykin, Neb., scale house built by J. H. Tillotson, Contractor.

Story and photos by Kristen Cart

An often unnoticed feature of every grain elevator is the scale house. The scale house is home to the cooperative site office, and is the place where the elevator conducts its primary business. It is usually an unassuming building where empty grain trucks pull up to be weighed before filling up. The trucks make a second visit when laden with grain, and the difference in weight is tallied in the office. Conversely, when a full grain truck pulls up to deposit its grain, it must return after unloading to determine how much has been loaded into the elevator. Inside the scale house, a small sample of the grain is tested for quality and moisture content.

The scale house in Benton, Kan.

The scale house in Benton, Kan.

Many scale houses are metal or brick buildings, often unattached to the elevator and some distance away. Most are  unremarkable. But some of the old concrete scale houses have unique charm. The scale houses that accompanied J. H. Tillotson elevators were particularly attractive, and are one of the first things to look for when identifying their elevators.

Scale house in Willows, Calif.

Scale house in Willows, Calif.

DSC_0538

Other builders also produced some remarkable scale houses. Elevator building was driven by engineering and economical constraints, but in some cases the scale houses received special attention. In Willows, Calif., I photographed an example that had to take first prize. This dandy building recalls a 1960s drive-in burger joint, complete with car-side speakers and root beer floats. While it is not an example of our grandfathers’ work, it deserves notice.

The simple lines of the back of the scale house at Kanorado, Kan.

The simple lines of the back of the scale house at Kanorado, Kan.

Joseph H. Tillotson developed a characteristic style for the scale houses his company built. Those I have visited appeared to be concrete, and many had attractive details. For more typical examples of his work, stay tuned.

A photo tour at Kanorado, Kansas, reveals subtle J. H. Tillotson design details

DSC_0642Story and photos by Kristen Cart

One of the best stops on my elevator tour last October was Kanorado, Kan. It was a fortuitous visit, made in the golden hour of photographic light. We have profiled the elevator before, based upon a visit by Gary Rich while the elevator was operating and open for an impromptu tour. But I wanted to see for myself the elevator my grandfather William Osborn built.

No one was there when we arrived, but I was able to get a good look at all sides of the structure. The straight up, classic lines were unique to  J. H. Tillotson elevators.

DSC_0664

A view of the integral headhouse with windows to admit light

Other companies built similarly styled elevators, such as the Greenwood, Neb. elevator built by Tillotson of Omaha in 1951. But those differed in shape and concrete detailing. The elevator at Kanorado was an earlier effort, and should be compared with those at Traer, Kan., Goodland, Kan., and Wauneta, Neb., among others.

DSC_0655

Late afternoon shadows are cast across the drive-through scale

 

Another design element that seems to be unique to Joseph H. Tillotson’s Denver-based company is the squat concrete scale house, a deceptively simple building with lovely proportions, as can also be seen with the J. H. Tillotson elevator at Daykin, Neb.

DSC_0687It is good to see another 1940s vintage elevator still doing its job nearly 70 years later. It is a testament to a work ethic that seems quaint in our present day, and a personal investment in quality beyond the next payday. My grandfather would be proud.

Elevator builders turned to wartime projects during World War II

Unknown, Gerald Osborn, William Osborn, Iver Salroth

Jerry Osborn (standing) with his father Bill Osborn (center) and Iver Salroth (right) in Galveston, Texas in 1945 during construction of Tillotson’s Fairmont building in Giddings.

By Kristen Cart

We have very limited information about the activities of Tillotson Construction of Omaha during World War Two. The other two elevator builders we profile, J. H. Tillotson, Contractor, and Mayer-Osborn, of Denver, Colo., began their operations after the war, but individuals working for both companies gained their experience during wartime, either at Tillotson Construction, or elsewhere.

Eugene Mayer, a partner in Mayer-Osborn Construction, previously worked in a partnership, Holmen and Mayer, based in Denver. Orrie Holmen was a University of Chicago-trained architect. Eugene’s sister Sheila was the wife of Joe Tlllotson. At some point after 1938, Joe left his brother Reginald in charge of the parent company, Tillotson Construction, of Omaha, and moved to Denver to start his own elevator business, accompanied by old Tillotson hands William Osborn and Bill Morris.

It would be fascinating to trace the wartime activities of each of these principal builders, if they can be learned.

Elevator photos026In the Tillotson company records, we found concrete elevator specifications beginning a few years before the War and resuming immediately afterward, but conspicuously absent were records of elevator construction during the War.

However, we know Tillotson Construction was active between 1942 and 1945. We found one snippet in an old newspaper, which we transcribed on the blog: https://ourgrandfathersgrainelevators.com/2012/05/08/nebraska-firms-get-government-contracts/.

When we learn more about the activities of the company during that time, we will certainly write about it here. It is an open line of inquiry, and we are eagerly seeking more information.

Part 2 of a photography outing unfolds the visual possibilities at Roggen, Colorado

Mayer-Osborn's Roggen, Colo. elevator has the typical stepped up headhouse.

The Roggen, Colo., elevator has the typical Mayer-Osborn stepped-up headhouse.

Story and photos by Kristen Cart

The stepped-style headhouse on the 1950-vintage elevator at Roggen, Colo., raised our suspicion that Mayer-Osborn Construction built the elevator, and that my grandfather William Osborn had a hand in it. Our hunch proved to be right. A 1950 newspaper account detailed its construction, as well as that of the concurrent project at Byers, Colo. Roggen’s elevator was built on the heels of its twin, the Mayer-Osborn elevator at McCook, Neb., which was completed the year before.

Gary Rich explores creative possibilities at the Roggen elevator.

Gary Rich explores creative possibilities at the Roggen elevator.

Last year Gary Rich, contributor to this blog, paid a visit to Roggen. He documented the manhole covers inside the driveway, which bore the company name in raised letters across the top of the steel plates manufactured by Hutchinson Foundry. After seeing his photographs, I was very eager to see the elevator for myself.

Last fall on a visit to Colorado I met with Gary, and we took in Roggen and Byers among other elevators on a photography tour. Roggen is fairly accessible and located just east of Denver. The purpose of our tour was to document the elevators, but also to inject some creativity into the process. The results were very pleasing, especially at Roggen. This is part two of our photo tour.

When I started looking for my grandfather’s elevators, I never suspected it would open the door to the elevator photography and historical research you find in this blog. Best of all, our contributors Ronald Ahrens and Gary Rich have made this project great fun for all of us. I hope you, our readers, get a kick out of it as well, and are inspired to follow your own quests wherever they may lead.

Empty containers frame Roggen's 1950 elevator

Empty containers frame Roggen’s 1950 elevator. 

A photography outing reveals beauty at the Mayer-Osborn elevator in Byers, Colorado

DSC_0221

A documentary photograph of the Byers, Colo. elevator.

In the fall of 2012, Gary Rich, contributor to this blog, treated me to a photo tour of western Colorado elevators. I made a special stop to meet Gary and his wife Sandy. The last few years Gary has specialized in elevator photography, capturing the beauty and spare elegance of grain elevators, identifying their builders as he went. The Byers, Colo., elevator is one of the loveliest.

DSC_0212

Gary Rich, camera in hand, looks for a better shot.

Sandy Rich is a very good photographer in her own right, and she has challenged Gary to greater creativity in his compositions.  He explained how her inspiration led him away from “documentary” shots and toward more artistic photography. When we stopped at Byers, Colo., we took some of her ideas to heart, and we were very pleased with the results.

Mayer-Osborn construction built the Byers elevator in 1950, as noted in a contemporary newspaper account. My father Jerry Osborn remembers his dad William Osborn working on it.

DSC_0205

Using the foreground to frame the subject adds interest to the photograph. Gary shot this composition first as can be seen on his photo site.

Retaining some of the characteristics of the earlier J. H. Tillotson elevators, the Byers elevator recalls those at Traer and Hanover, Kan. The Byers elevator is bigger than the Hanover elevator, and you can see where design adjustments accommodate the greater volume. The windows are very similar to those at Traer. The manhole covers on the exterior at Byers represent an innovation to fulfill local needs.

Since elevator designs continued to improve over time, an elevator design genealogy becomes apparent. The innovations cross company boundaries and are seen by looking at elevators chronologically, especially where the same builders and architects continued working in the business, bringing their ideas to one company after another. This is a chronology we are still trying to understand.

As we strive to understand elevator history, we take pictures. Elevators are worthy of our understanding and preservation for their beauty, not just their utility. Beautiful photos convey that message in a way that words can never express.

DSC_0241

The manhole covers on the exterior of the Byers elevator identify Mayer-Osborn as the builder.

DSC_0227

The Big Springs, Nebraska, elevator proved to be a Mayer-Osborn Construction job

The Cheppell, Nebraska elevator built by Chalmers & Borton

The Chappell, Nebraska elevator built by Chalmers & Borton. 

Story and photos by Kristen Cart

My grandfather William Osborn built an elevator in the western Nebraska town of Chappell, according to my dad Jerry Osborn. Dad’s recollections have guided our search thus far, for Mayer-Osborn elevators. Surely over the kitchen table he heard the names of towns where his absent father had construction jobs. Or perhaps he saw the postmarks of letters sent home.

Chappell was probably stamped on one of those postmarked letters, or it was the nearest town with a motel, because when I went to visit in 2011, there was nary a Mayer-Osborn elevator in evidence. Impressive elevators there were, but I found out later that they all had the ubiquitous Chalmers & Borton nameplate, the trademark of Grandpa’s biggest competitor.

The Mayer-Osborn elevator lacked the annex when it was first built. It is the same plan as used in McCook, Neb. and Blencoe, Iowa.

The Mayer-Osborn elevator at Big Springs, Neb. lacked the annex when it was first built. It is the same style as used in McCook, Neb., and Blencoe, Iowa.

One stop east on the rail line, however, was a large, handsome elevator that looked like one of Mayer-Osborn’s jobs. It was the spitting image of the first elevator Grandpa built on his own at McCook, Neb. The first time I saw it, I was curious enough to snap a photo, but identification was going to wait for another year. My dad knew nothing about Big Springs.

When Gary Rich, a contributor to this blog, looked into the builders of the elevators he photographed, he solved the mystery. He identified the Big Springs elevator by its manhole covers inside the driveway, each embossed with “Mayer-Osborn Construction, Denver, Colo.” above the Hutchinson Foundry stamp.

The Big Springs, Neb. elevator in October, 2012

The Big Springs, Neb., elevator in October, 2012. 

I paid another visit to Big Springs last fall after our Wyoming elk hunt. We didn’t get any elk, but I did get some nice photographs of the elevator. It was a sleepy Sunday with no one around. Next time, perhaps I can see inside.

It is an honor to pay respects to my grandfather’s enduring work. It is living history of a kind that is rarely noticed or mentioned. Once gone, it is scarcely remembered except in dusty repositories of pictures, and in mostly forgotten stories.

At Big Springs, Neb., that day of fading away is still far off in the future.