Government loans, subsidies led to elevator construction boom in 1940s and 1950s

The following observations come after Kristen’s recent foray in the University of Wisconsin library:

English: Chicago Board of Trade at night, phot...

The trip to check out the Farmers’ Elevator Guide was interesting. There is no index, so I have just scratched the surface. But this is an interesting twist on things: through the Forties and Fifties, the farmers’ cooperatives were a way of doing business along the lines of a union. There are articles about Washington’s involvement (that went so far as to prohibit all commercial building in the nation at one point, excepting elevators!) that makes today’s meddling seem mild by comparison.

Some of these articles, when I get back to Madison, are a must for the politics of the times that made this boom happen. Both the bumper crops that were bolstered by price supports, and various government loan programs and grain storage subsidies, made the business quite a going thing until it didn’t quite work any more. The Chicago Board of Trade complained we were on the road to Socialism. (And we were.) Much of the debate and business news made its way into the Farmers Elevator Guide.


Tillotson Construction wins Rock Valley contract, loses $870 judgment for employee’s injuries

Photo by Rock Valley city administrator Tom Van Maanen

East Elevator To Be Sold At Public Auction Saturday

Directors of the Farmers Elevator company decided last week to sell the red (east) elevator structure to make way for the new concrete storage elevator. Included also will be a feed shed and the driveway office structure.

Various and sundry pieces of equipment are being offered for sale, either before or during the public auction, scheduled to be held this Saturday, starting at 2:00 p.m.

The elevator building to be sold has a 15,000 bushel capacity and Manager Owen Manning has pointed out that the driveway and office would make a good machine shed. The feed shed measures 30 by 48 feet. See the advertisement on another page for the list of machinery and equipment up for sale.

Manager Manning said that the contract for the new concrete storage building had been awarded to the Tillotson Construction company of Omaha and that work on the structure will begin on or about June 1. The building is due to be completed about September 15 and work may be far enough advanced to permit acceptance of grain for storage about September 1.

Rock Valley Bee, Thursday, April 27, 1950 

♦ ♦ ♦

Sioux County Courthouse News 

In the case of Winfield Kenneth Bagley vs Tillotson Construction Company & American Mu. Liability, the court approved the compromise settlement between the parties in which the defendants are to pays $870.00 to plaintiff for injuries he received to his foot, while employed at Rock Valley, Iowa by the Tillotson Construction Co.

Sioux Center News, Thursday, August 16, 1951 

 

Tillotson Construction builds new elevator in Glidden, Iowa

Glidden—The Tillotson construction company, Omaha, started work Saturday on a new reinforced concrete elevator for the Farmers Co-Operative elevator at Glidden.

Carroll (Iowa) Daily Times Herald, Monday, April 11, 1949

Glidden—As part of an expansion program at the Glidden Farmers Co-operative company, work begun April 13 on a reinforced concrete elevator with a 100,000 bushel capacity is progressing rapidly toward completion.

About 20 feet higher than the present buildings, the new elevator will be situated east of them. With the additional storage space the company, for several years the largest co-operative elevator owned and operated in Iowa, will be able to take care of a large amount of corn and beans grown extensively in the Glidden area.

The 100-ft.-high main storage part of the new elevator is up, and bin bottoms are being covered with concrete and hopper fill.

Approximately 35 men are working 10 hours a day on construction of the new elevator, which is under the direction of the Tillotson Construction company of Omaha.

It is expected to be completed by July or August.

Carroll (Iowa) Daily Times Herald, Wednesday, June 22, 1949 

 

 

Leland Ulrich explains some facts about Mayer-Osborn’s elevator in Burley, Idaho

Story and photos by Kristen Cart

Burley, Idaho, January 18—I spoke to Leland Ulrich, manager here for the past seventeen years, and learned some particulars about this town’s Mayer-Osborn elevator. Mr. Ulrich replaced the old manager, Ivan, long since passed, who apparently had the building’s plans and pictures and history. That investigation is for another visit, since their whereabouts is unknown.

Mr. Ulrich took me for a short tour. I had to put on a hardhat to go inside. The vertical, rectilinear part of the building houses the headhouse way on top, with a “run” protected by a tin roof that went out from it to all of the round bins. The tin roof was a bit of an oddity, he said, but it was original. Most are concrete. The elevator was designed for seed, both barley and wheat, for farm planting.

Formerly a wood and metal elevator was beside it, but it burned in the late-1950s. Some of the big metal parts in the new building might have been that old, salvaged, but there was no way to be sure.

But the elevator built by Mayer-Osborn was all original. The number one bin, closest to the part that houses the head house and the man lift, was empty and I could look inside, but it was too dark to see anything. The bins have sloped floors at a pretty good angle so the last of the seed could be emptied down below, in the “pit.” Whether it was carried out of there by conveyor or some other means is something I missed. The “leg,” he said, in the bin adjacent to the number one bin, went all the way to within eight inches of the top, to facilitate proper distribution between the bins.

(Maybe Gary Rich can add a comment explaining what on earth that means.)

I did ask Mr. Ulrich what the ports are used for, and it is for access—so someone could get into the bins. So “manhole covers” it is. The port cover that was removed on the number one bin, which I’d peeked into, was only identified as Hutchinson foundry steel.

But there were Mayer-Osborn ports inside and out, painted and unpainted.  It’s a big elevator—much bigger than anything I’ve seen of theirs before, perhaps even as big or bigger than Tempe, Arizona.

Mr. Ulrich remembered another visitor who took pictures about ten years ago and sent him some prints. He thought Gary’s name sounded familiar, especially when I mentioned he worked for the railroad.

There is an old citizen in town named Lou Dilley, whose father, known as Pop, built the older flour-mill elevator. Mr. Dilley is said to be in his eighties and loves to tell about the history of the town. He apparently worked on his dad’s construction jobs. So if I can get back, he would be the one to see.

Comparing Mayer-Osborn elevators in Byers, Colorado, and McAllaster, Kansas

By Gary Rich

It is somewhat strange that you can have a company build an elevator, but there can be differences between two separate models. The Byers, Colorado, elevator was built by Mayer-Osborn. This model has the manhole covers on the outside of the bins, whereas the McAllaster, Kansas, elevator has the manhole covers on the inside. You will notice the manhole covers on the outside of the bins in the Byers view. Plus, there is a walkway door about halfway between the bins. The window arrangements are slightly different between these two elevators. Basically the driveway is the same on the two models.

One thing stands out like a sore thumb: whoever painted the Byers elevator painted the manhole covers. This is the only elevator where I have seen this done. Generally the manhole covers are not painted.

It would be the option of the Co-op what was wanted in the elevator. If the owners chose more options, of course the price of the elevator would increase, too.

There are two sides of an elevator. One is the track side, where the railroad tracks are located. The other side is known as the drive way, where the trucks will dump their loads.

I do not believe that the McAllaster, Kansas, elevator has been used for some years. The steel bins were empty, when I photographed here on November 14, 2011. The weeds were fairly high, and the rail spur has been removed. 

Mayer-Osborn Construction completes 450,000-bushel elevator in Burley, Idaho

Burley, July 22–Charles Barnes, manager of Union Seed company here, announced Friday that work is nearly completed on the new grain elevators and storage tanks west of town. He said the tanks, built to store all types of grain, have a capacity of about 450,000 bushels,

Eash of the 23 tanks is 135 feet tall and is made from six inches of reinforced concrete. The head house is 165 feet high, equivalent to a 16-story building. The tanks will be used to handle individual and Union Seed storage needs.

Barnes said that about 20,000 sacks of cement had been used in the construction under contract by Mayer-Osborn Construction company, Denver. He said the latest grain cleaning machinery has been installed, along with scales large enough to weigh the largest trucks, and that there are conveyer belts in both the head gallery and the basement tunnel.

Times-News, Twin Falls, Idaho, July 22, 1955

 

Tillotson Construction’s elevator at Dalton, Nebraska, shows unique features

Gary Rich contributed these photos from Dalton, Nebraska, along with the following analysis:

Tillotson Construction’s elevators were unique, with some features that I have not seen from other elevator builders. One major feature was the curved head house. I have only seen one other company that produced an elevator with the curved headhouse. Another feature was that Tillotson put windows for light into the basement. Of course they had electric lights in the basement. I have not seen another builder put windows in the bottom part of the elevator. This must be a Tillotson trademark. This elevator has the year of construction added to the manhole covers. It shows 1958. Tillotson did a great thing by adding this. All the elevators that I have been inside, I have not seen another company put the year on the manhole covers. The date was on each manhole cover inside the elevator.

Thompson, Iowa, elevator completed in 1950, torn down in early 1980s

Work Underway on Storage Elevator

Thompson – Work has been started on a 125,000 bushel storage elevator for the local co-operative elevator company by the Tillotson Construction company of Omaha, Nebr.

Mason City (Iowa) Globe-Gazette, June 20, 1950

Mason City Globe-Gazette, September 2, 1950

♦ ♦ ♦

Our call to the Farmers Cooperative elevator in Thompson, Iowa, while preparing this post resulted in a conversation with location manager Lyle Wirtjes, who said he started working at the elevator in 1969. By then, Mr. Wirtjes said, one silo had already “busted out.” After another such incident, a new elevator was constructed across the road and the Tillotson elevator was torn down sometime in the early 1980s.

♦ ♦ ♦

Kristen’s analysis:

This Thompson elevator should not have failed—look at Greenwood, still here after all these years. I would guess there were some corrupt people in the building trades pulling off a scam, and since so many projects were going at once, a few poorly done elevators slipped through. They all looked like carbon copies of one another, so unless soil, water table problems, or fire caused the break, crooked subcontractors could have caused it. Not an uncommon problem when the federal cash spigot is turned on full blast—everyone shows up to the party, whether good or not.  My speculation here.  Nineteen years is not much of a lifetime for an elevator, barring a fire.


Painting a concrete grain elevator in Lincoln, Nebraska

Merle Ahrens, uncle of Ronald Ahrens, has written an account of his summer of 1955, which was spent on a scaffold with another of Ronald’s uncles, Michael Tillotson, youngest son of Reginald and Margaret Tillotson:

After graduating from Omaha North High School in 1955, I went to work for Tillitoson Construction on a grain elevator in Lincoln, Nebraska, with Michael Tillotson. I was paid $1.25 an hour.

Merle at home

Merle Ahrens in 2011, at home in Titusville, Fla.

I remember the first day on the job we had to go to the top of the grain storage tank—at least 100 feet—on a bucket that was used to haul up concrete. The bucket was connected to the swinging boom at the top by a wire cable. The cable went to a stationary, manually operated, rotating spool, which wound up the cable to lift the bucket. The operator let it free-fall down, seeing how close to the ground the bucket and riders could get before hitting the brake. It was a scary ride with four or five other workers standing on the rim of the bucket, especially the free fall down. Thankfully, it didn’t take long to get used to.

At the top, there were no rails around the edges nor any safety provisions like you see today, just one jack rod sticking out of the surface to hold on to as you got on and off of the bucket. The first day, I spent a lot of time holding onto that rod looking over the side.

When Michael and I started work, all the concrete pouring was complete and we were given the task of painting the outside of the whole elevator. We painted it using a lime-base whitewash. We had to crawl over the edge of the top of the tank onto a flying scaffold. The scaffold was held up by a pair of rope block-and-tackles connected to a pair of wood beams that were extended about two feet over the edge of the tank. The wood beams extended about ten feet inboard and were weighed down with sandbags to keep the scaffold from falling. The scaffold was made up of a pair of two-by-twelve boards with a metal frame at each end and two-by-four railings around it. The rope block and tackles were attached to the scaffold on the ground. We had to pull the scaffold up to the top every time for each ten-foot width we painted. There was an old man on the ground who mixed the paint and pulled it up to us in a five gallon bucket. He had a harder job than we had. All we had to do was brush on the paint and pull the rope to release the half hitch that held up the scaffold and let gravity work to lower it. The “flying” part of flying scaffold was when the wind was blowing. You would fly halfway around the tank.

Every night we would take off our Levi’s and stand them in a corner. There was so much paint on them! Yet one pair lasted all summer.

After a couple of months we finished painting the elevator in Lincoln and went to David City to paint another grain elevator. This time we used a new latex paint. It was very slow-drying and the wind kicked up a lot of dust. The elevator ended up white with grey stripes.

We kept hearing of accidents at other sites. One man was said to have fallen from a plank used to walk between the top of two tanks. He was wearing new boots and slipped. Another was killed when roofers removed the sandbags holding the beam for the flying scaffold so they could hot-tar the roof. A couple more were hurt while riding on a bucket and the clamps holding the cable slipped. The clamps were installed wrong. I do know for a fact that one worker at Lincoln was hit in the face when a five-gallon bucket with concrete in it fell while he was using a rope and pulley to lift it overhead.

At the end of the summer, Michael went back to North High, and I went to work for the Union Pacific Railroad.

Merle Ahrens

January 9, 2012