A photographic review of concrete elevator parts and components

Story and photos by Kristen Cart

Some time ago, one of our readers requested the picture of an elevator pit. It is one of the more unglamorous parts of a grain elevator, but as I was going through old photos, I found one. I also found many interior elevator pictures that have not made it to the blog because of their, well, unattractiveness. But a review of the parts and pieces, terms and descriptions, and interior appearance of an elevator is in order.

 The Pit

Pit access by ladder. The leg is visible.

Pit access by ladder. The leg is visible. Hanover, Kan.

DSC_0677(2)

Sloped bottom funnels grain to the base of the leg.

The Dump Grate

DSC_0674(2)

A smaller grate.

DSC_0292(1)

Center driveway truck grates.

The Driveway

DSC_0410

McCook, Neb.

DSC_0208(1)

St. Francis, Kan.

The Man Lift

DSC_0679(1)

The bottom of the lift showing the shaft.

DSC_0210(1)

Current safety regulations require a retrofitted cage.

Overhead bin spouts

Bins are numbered to correspond with the bin diagram

Bin Diagram

St. Francis, Kan.

St. Francis, Kan.

DSC_0295

This elevator holds beans in two overhead bins.

DSC_0670(1)

The bins hold milo, and “F” means the bin is full.

The Leg

DSC_0418

Cup dimensions and spacing are given in elevator specifications.

DSC_0673(1)

The leg conveys grain from the pit to the top of the bins.

Manhole Cover

Traer, Kan.

Traer, Kan.

 

An unlikely connection to Tillotson’s elevator in Elkhart, Kansas

photo

By Ronald Ahrens

“Oh, look at the funny building!”

So might a visitor from Southern California say after driving 1300 miles to Elkhart, Kan., in order to celebrate a niece’s graduation.

As it turns out, that visitor keeps bar at my club.

I heard her say she had been to Kansas.photo-1

“Where in Kansas? Atchison? Topeka?”

“Oh, nowhere. Elkhart.”

(They went across the Oklahoma border to have some fun. She won’t send the photo of herself dancing on the pool table.)

“Really? My grandfather built the Elkhart grain elevator, starting in 1945. I hope you took a picture.”

As it turns out, as you see, she took two.

Some day, I’ll explain everything she wants to know about reinforced concrete construction, surface bearing load, elevator motor speed, and storage annexes.

Meantime, we have all this.

Thank you, Shirin.

 

 

Insights from a Ralston, Iowa, elevator maintenance worker

DSC_5966

At the far left edge of the photo, the annex can be seen behind the similarly sized elevator.

Story and photos by Kristen Cart

Each time we travel to Nebraska to see our family, I try to investigate elevators, and the kids groan and roll their eyes, pulling electronic entertainment out of their backpacks.

In March, our trip home warranted a stop at Ralston, Iowa, where we hoped to see an annex built by Tillotson Construction Company of Omaha as we trekked eastbound along U.S. Highway 30. Ralston is about midway across the state and lies south of the highway, and is the site of one of the projects documented in Tillotson company records.

The West Central Cooperative elevator complex, silent and lofty, rimmed the edge of town as we approached on a bright Sunday afternoon. Not a soul was in sight as we entered the parking lot near the cooperative headquarters. But a car in front of the office building was open with a shopvac beside it. Someone had to be around.

DSC_6016

A much larger group of elevators was behind me, away from the town, as I took the photo.

The elevator group in Ralston is dominated by a large squarish elevator, a multi-bin elevator, and a large, multi-bin, rectangular annex snugged in beside the latter. Between the first elevator and the second is an old wood elevator which immediately attracted my attention. It made a fine photographic subject. While shooting the scene, I looked for signs of a Tillotson project. Nowhere was there any manhole cover with the name of a builder. And no one was present who could give me a look inside.

The annex, slightly narrow than the elevator, is on the left

The annex, slightly narrower than the elevator, is on the left.

In fact, the deserted elevator group so dominated the town, along with its companion group of elevators a mile or so down the tracks, that it seemed intimidating to go near it. So I stood off and took photos from across the street.

DSC_6001Heavy rail traffic attended the tracks alongside the elevators in spite of the sleepy Sunday. I counted several trains, blaring their arrival as they passed through town.

At last, a fellow emerged from the cooperative building and commenced vacuuming the company car. I approached him to ask him about the elevators. Ron Hickey, of Farnhamville, Iowa, waved a friendly greeting. He said he was a bit of a newcomer to the Ralston site, but had worked at Boxholm, Iowa, the site of another Tillotson elevator, for two years before coming here. He said that Boxholm’s elevator had 96 florescent light bulbs, and until recently, he was responsible for cleaning every one of them.

Presently, he was cleaning one of several company vehicles parked in front of the nicely appointed offices. The place had every sign of prosperity. Ron said West Central was one of the largest cooperatives in Iowa, and was very successful.

Once we arrived home, I had to resort to the company records to positively identify Tillotson Construction’s contribution to the site. The specifications for Ralston fit the size of the annex I had seen–a massive structure about twice the size of the average elevator project. Since this structure was an annex, many items normally included in a complete elevator build were not required. The Tillotson construction details are reproduced below.

The Ralston storage was built in 1953 using the “Ralston Plan,” which had eight 28′ diameter, 115′ tall bins with a 2′ spread, flat bottoms, and a screw conveyor.

Capacity per plans: 537,000 bushels

Capacity per foot of height: 4,838 bushels

Reinforced concrete per plans (total): 2,779 cubic yards

Plain concrete (4″ hoppers and liner): 9 cubic yards

Reinforcing steel per plans (includes jack rods): 168.18 tons

Average steel per cubic yard of reinforced concrete: 121.00 lbs.

Steel and reinforced concrete itemized per plans

Below main slab: steel 3,128 lbs.; concrete 29 cubic yards

Main slab: steel 102,340 lbs.; concrete 606 cubic yards

Draw form walls: steel 203,034 lbs.; concrete 1,920 cubic yards

Driveway and work floor: not installed

Deep bin bottoms: not installed

Overhead bin bottoms: steel 4,666 lbs.; concrete 24 cubic yards

Bin roofs and extension roofs: steel 14,284 lbs.; concrete 112 cubic yards

Cupola walls: steel 8,907 lbs.; concrete 20 cubic yards

Distributor floor: concrete 2 cubic yards (steel included in above total)

Cupola roof: concrete 3 cubic yards (steel included in above total)

Miscellaneous (boot, leg, head, track sink, steps, etc.): not installed

Attached driveway (in this plan, a gallery, with cross tunnel not included): concrete 63 cubic yards (steel included in above total)

DSC_6010Construction details

Main slab dimensions: 66 2/3′ x 121 2/3′

Main slab area (actual outside on ground): 7,738 square feet

Weight reinforced concrete (4,000 lbs. per cubic yard plus steel): 5,726 tons

Weight plain concrete (4,000 lbs. per cubic yard): 18 tons

Weight hopper fill sand (3,000 lbs. per cubic yard): 154 tons

Weight of grain (60 lbs. per bushel): 16,125 tons

Weight structural steel and machinery: 20 tons

Gross weight loaded: 22,043 tons

Bearing pressure: 2.86 tons per square foot

Main slab thickness: 24 inches

Main slab steel (size and spacing): straight; 1 1/4 square inches and 8 inches o. c.

Tank steel and bottom (round tanks): 5/8 inch diameter and 6 inches

Lineal feet of draw form walls and extension: 717 feet 7 inches; 39 feet 6 inches

Height of draw form walls: 115 feet

Pit depth below main slab: 9 feet 6 inches

Cupola dimensions (outside width and length and height): 12′ x 14′ x 20′

Pulley centers: 137 1/2 feet

Number of legs: 1 main (see pulley center above) and 1 jack

Distributor flow: yes

Track sink: no

Full basement: no

Electrical room: no.

Driveway width-clear: not installed

Dump grate-size: not installed

Columns under tanks: not installed

Boot–leg and head: steel

Machinery details

Head pulley (main leg): 48″ x 16″ x 4 15/16″

Boot pulley: 48″ x 13″ x 2 3/16″

RPM head pulley: 48 rpm

Belt: 15″-6 ply calumet

Cups: 14″ x 7″ at 10″

Head drive: Howell 40 horsepower: 3

Theoretical leg capacity (cup manufacturer’s rating): 7,950 bushels per hour

Actual leg capacity (80% of theoretical): 6,350 bushels per hour

Horsepower required for leg (based on above actual capacity): 26.4 horsepower

Man lift: not installed

Load out scale: not installed

Load out spout: not installed

Truck lift: not installed

Dust collector system: fan into bin

Cupola spouting: not installed

Driveway doors: not installed

Conveyor: 24 inch screws

Also built

Track scale: 50 foot, 50 ton: concrete 35 cubic yards

 

 

 

 

The 1945 vintage elevator at Lodgepole, Nebraska, and the death of Bill Morris

DSC_0446Story and photo by Kristen Cart

A newspaper article recently came to light that upended our elevator construction timeline, causing us to reconsider the story of the Lodgepole, Neb., elevator and the careers of Joseph H. Tillotson and my grandfather William Arthur Osborn.

My dad, Jerry Osborn, said that the death of Bill Morris, the superintendent on the Lodgepole job, and that of Joe Tillotson, the owner of J. H. Tillotson, Contractor, came within a month or so of each other. Now it appears likely that the season was the same, but both fatal car accidents occurred in different years–1945 and 1947–a fact easily misunderstood by the young boy my father was at the time, as he listened to the adults talk about business.

elevator021

We believe this photo by William Osborn is from Lodgepole, Neb.

The article appeared in the Nebraska State Journal on Oct. 8, 1945:

Omahan dies after car accident

SIDNEY, Neb. (AP). W. B. Morris, 36, an employee of the Tillotson Construction company, of Omaha, was fatally injured Saturday night when struck by a car driven by Howard B. Kirk, 48, of Lodgepole, Neb., Deputy Sheriff Arnold Braasch said Sunday.

The deputy sheriff reported Morris was changing a tire on his car about ten miles east of here when the accident occurred. He died in a hospital about five hours later.

Braasch said Morris’ home was in Texas, but that he was living in Lodgepole while working on the construction of a new grain elevator.

County Attorney R. P. Kepler said he will decide on Monday whether an inquest is to be held.

We attributed the Lodgepole elevator’s construction to J. H. Tillotson, Contractor, the independent company Joe Tillotson started after his parting of the ways with Tillotson Construction of Omaha. We wrongly believed that both Bill Morris and Joe Tillotson had died in 1947 while working on the Lodgepole job. Now we know that Bill Morris died in 1945 while working for Joe Tillotson. The new fact pins down the date of Joe’s departure from the Omaha company–a move my grandfather made at the same time.

When interviewed in 1949 about his first, independent, Mayer-Osborn Construction venture in McCook, Neb., William Osborn named a number of elevators he had built before. We still believe all of the elevators Bill Osborn listed were J.H. Tillotson elevators.

According to the McCook article, Bill Osborn said the elevators in Maywood, Traer, Wauneta, and Lodgepole were built in 1945. If the reporter was right about Bill Morris’ employment, all of the 1945 elevators would be too early to be J. H. Tillotson elevators. However, none of them were recorded in the Tillotson Construction specifications and none built in the Omaha company’s style.

The reporter writing about Bill Morris’ death in 1945 was unaware of the freshly minted company Joe Tillotson had started, and wrongly identified Bill Morris as a Tillotson Construction of Omaha employee.

DSC_0369

An early photo of the Lodgepole elevator was kept at the location.

The fact that in 1945, Bill Morris went from a superintendent job at a verified Tillotson Construction project in Giddings, Tex to a superintendent position at the Lodgepole elevator job, a project demonstrably not built by the Omaha company, precisely dates the time Joe Tillotson chose to go out on his own.

The 1945 construction date of the Lodgepole elevator gives us a much more accurate understanding of the birth of J. H. Tillotson, Contractor, a venture that lasted about four years, until my grandfather built the McCook elevator for Mayer-Osborn Construction in 1949.

A tragedy took Morris in his prime, but my grandfather stepped into his place, gaining valuable experience as a builder. To this day, the graceful Lodgepole elevator serves as a fitting monument to Morris’ productive career.

A reader recalls his youthful days at the grain elevator in Emmetsburg, Iowa

This T.E. Ibberson elevator, foreground, keeps company with a Tillotson elevator, right, in Dallas Center, Iowa. Photo by Kristen Cart

This T.E. Ibberson elevator, foreground, keeps company with a Tillotson elevator, right, in Dallas Center, Iowa. Photo by Kristen Cart

By Paul Grage

Editor’s note: Paul Grage (pronounced “GREGG-ee”) of Rockwell City, Iowa, is a 39-year-old supervisor at North Central Correctional Facility there. In his free time he surfs the Web looking for elevator sites.

I would like to share some memories of Cargill in Emmetsburg, Iowa, during the 1980s.

My fondest memory is of Old Number 2, built by T.E. Ibberson, of Minneapolis. My dad was the manager from 1979 until about 1996, and I would often call after school at harvest to see if I could come hang around. If they were accepting grain at Number 2, that is where I would be.

The alleyway [driveway] was huge. It had one  main grate and two side grates for overflow that all emptied into one  pit. It had a large horn like a fire alarm buzzer. This  sounded for phone calls, when the leg was up to speed, or when a bin ran full. The side entrance inside was flanked by two large aerator fans that roared. As a kid, it was kind of terrifying to exit between these two.

The Ibberson nameplate. Photo by Kristen Cart

The Ibberson nameplate. Photo by Kristen Cart

I remember the rippling of the grates as semis crossed them. I still remember the old portable, homemade, electrically powered, hydraulic pump that raised the old barge box wagons pulled by pickup trucks.

I remember the old gate at the bottom of the pit that accessed the leg. It was moved by a large lever next to the pit, right next to the leg button. You had to hear the buzzer before you opened that gate unless you wanted to plug the leg before it got up to speed. My dad tells horror stories about unplugging the leg. A test of your manhood was to go to the headhouse and hold back the anti-rollback dogs, like a one-way clutch, with a wrench or bar. The whole trunking would shake. The distributor crank was right next to the leg and man lift. It was a lever brake and crank-style bin selector that had belt pulley webbing on it to indicate which bin you had selected.

I remember the first trip to the headhouse with my brother. He was an employee with Cargill before they had nepotism rules. It was a sight to behold: the big open headhouse with all of its huge spouts, the huge gearbox and chain-drive leg and the big distributor. Inside this headhouse was a huge plywood shack. It was explained to me that it was a tripper scale used for loading railroad cars. It was long out of use, as this elevator had no rails and the new elevator did. This tripper scale did have long rods that extended down the man lift shaft to the alley below.

I remember the ride up the man lift with my brother. The dust was so thick on the walls the people had stopped along the way and scratched rather colorful sayings in the dust. (This was long before the days of dust control, so that dust was a good three inches thick in that man lift shaft. Now they have an air chuck so they can blow the dust down.) When I say man lift shaft I mean man lift onlythe leg shafting was built into the concrete.

The T.E. Ibberson name on the manhole cover.

The T.E. Ibberson name on the manhole cover.

The metal trunking only existed between the boot pit up to ceiling of the alleyway and then from the bin deck to the leg-drive pulley in the headhouse. The rest of the leg trunking was made of a cement column inside. The shaft that the rest of the bucket was built into was hopper-bottomed just like all the overhead bins.

If I remember right, this elevator had eighteen overhead bins, one of which was used for rail car/tripper scale.

After learning the elevator inside out, the ironic thing is that I could never go to work in the grain business because I’m allergic to soybean dust. It’s almost lethal to me. When I was a kid, it didn’t faze me a bit. But my last year I hung around there, around 1988, I had to wear a respirator. 

Something else: They don’t paint this elevator any longer because it’s stress-cracked. They quit painting it because it was making the concrete rot. I like the aged look.

In 1954, near the boom’s end, Albert City, Iowa, had a gleaming concrete elevator

Albert City, Iowa

By Ronald Ahrens 

Looking at this photo of Tillotson Construction Company’s 252,000-bushel elevator, completed in 1954, it’s easy to imagine the pride and awe of a small town’s few hundred residents.

Albert City is in northwest Iowa on a spur from Route 3, not far from Storm Lake in Buena Vista County. The Tillotson’s had also built that same year in nearby Pocahontas, where there was tragedy.

The Albert City job went more smoothly as the structure rose far above the tallest elms, although Uncle Charles Tillotson, who recently dug up this photo, has written about his frightening dismount from the formwork during a storm.

Uncle Michael Tillotson has also recollected about working here:

“The following summer (1954) we went to Albert City, Iowa, 75 miles North of Council Bluffs. We rented rooms in a private home. We worked with a 20 something guy that ran the winch pulley bucket to the top of the elevator as it progressed, and brought building materials down. We also rode the bucket up and down to get on deck. The elevator bens were 125 feet to the top with a Head-House of 75 on top of that.”

Company records show the elevator was built according to the same plan used in Pocahontas. This entailed eight outer bins that were eighteen feet in diameter and, contrary to Uncle Mike’s reckoning, 120 feet tall. Altogether, some 2091 cubic yards of concrete were reinforced by 106.57 tons of steel.

The bins rose from a main slab 21 inches thick and 60 x 72.5 square feet in area. It supported a gross loaded weight of 12,974 tons.

The cupola, or headhouse, was 23 feet wide, 58 feet tall, and 40 feet long.

Albert City was a single-leg elevator. Its head pulley was 72 inches in diameter and turned at 42 rpm. A 40-horsepower Howell motor supplied more than enough energy to turn it.

Twelve-inch-wide cups on a six-ply, 14-inch-wide belt carried up the grain that was dumped by incoming trucks. The 12-foot-wide driveway had two dump grates: 9 x 6 feet and 9 x 14 feet.

In 1954, Tillotson also built in Dacoma, Lahoma, Orienta, and Weatherford, Okla.; Booker, Tex.; Ensign and Montezuma, Kan.; Bellwood, Neb.; and Glidden, Goldfield, Newell, Manson, Pocahontas, and Iowa Falls, Iowa.

These were among Tillotson’s last elevators–the records close out with work in 1955–and they represented nearly everything the company knew about building.

A visit to Google Maps shows the elevator is still standing, which is to be expected given the Herculean effort needed to knock down all that reinforced concrete. But it appears idle. Given what we’ve learned about the limitations of midcentury elevators and today’s need for greater storage capacity and quicker unloading, that would make sense.

Nevertheless, it endures as a handmade monument, and a rich human history goes with it.

With their works in Estill, South Carolina, Tillotson built big in cotton country

Freshly harvested cotton field in central South Carolina

Freshly harvested cotton field in central South Carolina.

Story and photos by Kristen Cart

The brightly wrapped cotton bales highlighted an otherwise drab landscape as I traveled the 91 miles south from Columbia to visit the Estill elevator, originally built in 1947. Rain and haze flattened the view. Since it was Sunday when I visited the elevator, few people appeared to be about. It was going to be a photography outing, for better or for worse.

DSC_3487

The Estill elevator, greatly expanded since it was built in 1947, was secured behind barbed wire.

I graduated high school in South Carolina. My impression of the place, after growing up in the western desert, was one of endless dark pine woods, with a brief gaudy display of azaleas and dogwood blooms in springtime.  I didn’t appreciate the raw beauty at the time. Now, on a soggy day, it had a mysterious appeal.

DSC_3431When I learned that the Tillotson Construction Company built an elevator in the state, it came as a surprise. We do not know who built the original house in 1947. Tillotson, according to company records, built the 225,000-bushel annex and a second, larger elevator, in 1952 and 1953, respectively. The trademark rounded headhouse rises above the 350,000 bushel elevator, built to finish the concrete elevator complex.

Michael M. DeWitt, Jr. outlined the history of the Estill elevator in his article for the Hampton County Guardian published on December 14, 2010. The article was written to herald the purchase of Carolina Soya by ADM. During its heyday, the elevator stored soybeans for soybean processing, which was part of the operation. Now it is strictly a storage facility for ADM, focusing on soybeans but also accepting corn.

The company laid off staff upon acquiring the facility in 2010, shrinking from 45 to 14 workers, heralding a loss to the community in a time of slow economic growth. ADM promised to hire from the laid off worker pool as needed.

DSC_3406I noticed that the good times had passed during my drive down. The decline of the area was evidenced by empty store fronts and decrepit gas stations, ancient closed restaurants, and tired houses–all along the highway south from Columbia, it was apparent that development chose another corridor and not this one. I wondered if there was one open gas station anywhere along the route.

The histories neglect one of the Estill elevator’s darker episodes. In the ’40s and ’50s, construction safety was not mandated as it is now. In one of the accidents that was all too common for elevator construction, Wayne Eugene Baker lost his life in a fall while working on the storage addition, or annex, built in 1952. For all of the heartache, Wayne helped build a thing of beauty that sustained its neighborhood for many years and still brings economic benefit to its region.

In Argentina, we encounter a colorful solution for abandoned elevators

IMG_8907

Story and photos by Ronald Ahrens

I went to Rosario, Argentina, the first week of January for a magazine assignment, and the group I was with ended up having lunch on the bank of the Rio Paraná, a big muddy river capable of handling large cargo ships for carrying grain and coal. Like so much else about this land of the Pampas, the Paraná reminded me of something you’d find in the Midwestern United States–specifically, it was perhaps wider than the Missouri River but not quite up standard set by the Mighty Mississippi.

IMG_8906As we had earlier driven into this large city–Argentina’s third-largest, with nearly 1.3 million people–I noted a couple of grain elevators, including what looked like a huge wooden one. But I was being herded with a group of reporters following the Dakar, a marathon rally for motorcycles, cars, and trucks. Rosario sprawls over 70 square miles, so there was no way I’d be able to make my way back there from the hotel where we were staying near the river.

How surprised was I when we went from the Juan Manuel Fangio Autodrómo, where the Dakar teams were set up before the rally’s start, to have lunch? The destination was a restaurant affiliated with the Museo de Arte Contemporáneo de Rosario–the museum of contemporary art. We parked on the riverside boulevard, Avenida Estanislao López, and as soon as we started walking I saw the colorful bins of a made-over elevator.

The art museum is integrated into the elevator!

IMG_8908I didn’t come away with any specifics, although it did occur to me to look for manhole covers that might have been cast with the builder’s name. I saw none, though.

As for the rest I hope these pictures tell the story.

By the way, Argentinians are very proud of their beef, and I was told repeatedly in advance of the trip that I should be sure to eat the beef because it’s out of this world. I did have a couple of nice steaks, but there’s no difference from U.S. beef.

IMG_8910

This tower, attached to the elevator, faces out to the river.

And this footnote: the passenger next to me on the flight home said the countryside has changed since the Chinese market for soy opened up–fewer grassy pastures, more fields with the crop. Presumably, there would also be changes in the way cattle are finished for market. Anyway, that explains why so much of Argentina looked like western Kansas, minus the farmhouses and barns.

The countryside is curiously devoid of buildings; everybody lives in town.

The Tillotson elevator in Lincoln, Nebraska is majestic in winter light

DSC_3138Story and photos by Kristen Cart

One of the most beautiful projects completed by Tillotson Construction of Omaha was their elevator with its annex in Lincoln, Neb. I was fortunate to be able to persuade my dad to stop with me to take some photos in perfect light.

DSC_3174One of the challenges of elevator photography is picking the structure out from its sometimes tight surroundings.

Usually you can take close pictures with a wide angle lens, which distorts straight lines, but can give you a full view of the elevator. In this case, I was without that tool since it broke when it fell off a chair, so I had to make do with a mid-range zoom lens.

You be the judge of whether the pictures were successful, given the limitations of distance, obstructions, and points of view.

DSC_3184

The trademark rounded headhouse rises above one of the largest elevators Tillotson Construction built

This elevator is a couple of blocks from the Cornhusker Highway in Lincoln, and one of the obstructions to a clear shot is an overpass feeding traffic to that main artery through town. The limited view required some cropping of the elevator. But the light and sky made up for the field of view.

The manhole covers display the company name on both the elevator and the annex

The manhole covers display the company name on both the elevator and the annex

We do not know why the Lincoln elevator is not among the projects recorded in the company ledgers. It appears that at least one page was missing from the records, and there is no way to know where it is, or why it is missing. So the only information we have about its construction is from the manhole cover on the main elevator, which says 1955. Presumably, the annex was built shortly thereafter.

Because the facility, AGP Grain Cooperative, was closed, we obtained no further details on this visit. This elevator will be the first on our list when the harvest time comes around again, and we can see the elevator in operation for ourselves.

Christmas ideas for an elevator enthusiast

DSC_0075Story and photo by Kristen Cart

Our good friend Linda Laird shares our interest in American grain elevators and has devoted much of her time to documenting these historic landmarks of the plains. I purchased her book some time ago and found it very enlightening. She did a terrific job. This book is on my short list of recommendations for Christmas, if you have an elevator lover on your list.

The American Grain Elevator

Another good friend and fine photographer Bruce Selyem, and his wife and excellent writer Barbara Selyem, have published several books on the subject of grain elevators, and they also publish an annual grain elevator calendar. Last time I checked they still had a few for sale. They also have fine prints for sale if you find an image of an elevator you can’t live without. I spend time on their site while planning elevator trips because of their extensive coverage of elevators all over the country and in Canada.

Grain Elevator Photos

Lastly, it is always a good idea to visit Gary Rich’s elevator photo pages to see his latest elevator photography. He recently finished a trip to Oklahoma, so I expect to see new images from there soon. He says he loves taking pictures in the winter sunshine, which is the perfect illumination for his subjects.

Gary Rich Grain Elevators

Enjoy the season!