McCook’s J. H. Tillotson-built elevator is still all original, down to the light fixtures

J. H. Tillotson built this attractive elevator at McCook, Neb. in 1948.

Story and photos by Kristen Cart

Kelly Clapp explains how levers and pulleys are used to distribute grain.

The straight-up elevator at McCook, Nebraska, was built for a private owner in 1948. J. H. Tillotson, Contractor, of Denver, Colorado, was tapped for the project, and it was completed just a year before the Mayer-Osborn Construction Company of Denver built the nearby Frenchman Valley Cooperative elevator. My grandfather, William Osborn, was a superintendent for Joe Tillotson at the time, just before going on to form the Mayer-Osborn Company with Gene Mayer, so both projects were his.

Kelly Clapp, a Frenchman Valley Co-op employee, opened up the elevator so I could look inside. A trapped pigeon stood  in the doorway when it opened, blinking in the unaccustomed light. It fluttered off when we went in. What I saw was state of the art for 1948.

The elevator leg, which lifts grain from the pit to the top of the bins.

The elevator stands by itself and is unique since no renovation has ever been done to it. The elevator is original, right down to the light bulbs, Kelly said. It operates as it always has. It only takes corn when the other McCook elevators are full. The elevator is cleaned right before harvest, so the manhole covers, stamped “J. H. Tillotson, Denver,” were off and the bins were open.

The elevator has basic electrical functions such as lighting, and the conveyors and the leg are motor-operated, but all of the controls for it are manual. Levers and pulleys operate in the driveway to direct grain chutes to load corn into a waiting truck, and a similar arrangement at the top of the man-lift directs grain into the proper bin while loading the elevator.

The interior of the driveway, with the leg to the right.

This elevator is a completely intact example of our agricultural past–as fascinating as a water-driven grist mill from the century before. Structures of concrete and steel, built for industrial purposes, don’t merit a historical marker or national designation, but they are just as significant as an ancient town hall or a dignified farm house. I think I prefer the plain functionality of the grain elevator.

In Wahoo, Nebr., Tillotson’s elevator finds new life as a cell tower for AT&T

The Wahoo, Nebraska elevator, built by the Tillotson Construction Company of Omaha, Nebraska

Story and photos by Kristen Cart

Another stop on my recent elevator trip was Wahoo, Nebraska. Dad tipped me off that it might be one of Tillotson’s projects. Wahoo is the seat of Saunders County, where Dad lives, and he frequently has occasion to stop there.

Wahoo’s elevator, at first glance, appeared unused. It was closed up tight, and the only indication of any activity was a sign warning workers to stay at least three feet away from any antenna, and to contact AT&T before performing any maintenance or repairs near their equipment.  Ah, hah!  Then I noticed the wires running to the top of the structure. I walked around the elevator, taking pictures.

Next door to the building was a Pet Rescue center, and as a woman was leaving there with a little dog in her arms, I asked her about the elevator.  While she did not know the builder, she said the elevator was privately owned by David Rood, and that at present, the elevator was full of corn.  But she commented that he probably made more money from the AT&T installation. I had heard of cell antennas being installed in every kind of tall building–even church steeples–but it had never occurred to me to look for them atop an elevator.

The next circuit around the elevator produced the answer I was looking for. Right there, adjacent to the sidewalk, in bright blue paint, was a manhole cover.

Some neighborhood teens were hanging around the street, in their cars, and when they saw me kneeling, taking the manhole cover shot, one of the boys shouted out, “What are you doing?”

“Taking pictures of the elevator!” I said.

The young man wanted to know why. When I said it was for a blog, I guess that was enough for him. Anyway, his attention went back to something on his cell phone.

The Wahoo elevator is an attractive feature of the town, fitting naturally with the older buildings along the main street. A man at a local pub, seeing my camera, popped out and said curiosity got the better of him. I told him what I was doing there. I guess a tourist with a camera along the street is a little unusual. And Nebraskans, by nature, like to know who is about.

Jerry McBride worked at Wauneta’s elevator in the ’60s before repairing cars

Jerry McBride at Bob’s Repair Service in Wauneta, Nebraska

Story and photos by Kristen Cart

On the way out of town after visiting the Wauneta, Nebr., elevator complex, we noticed a rather striking old building, which was an auto repair garage, currently owned by Robert Jones, and called Bob’s Auto Repair and Service, at 512 S. Tecumseh.

I stopped to take pictures. A man came out, introducing himself as Jerry McBride, and asked if I liked old buildings. I said I did, and that I had a particular interest in old elevators, having visited Wauneta’s that day. He invited me in to see the shop. It had been built in the 1920s, Jerry said, and mostly knocked down by a tornado sometime before the 1950s, when it was rebuilt and an extension added.

All of this happened before Jerry was employed there.

Wauneta’s original elevator

He said that he had been hired by Ivo Valentine Pennington in about 1962. Before that he was employed as a “broom man” at the Wauneta elevator for six months or so, making fifty cents an hour. Cleanliness was of utmost importance at the elevator. Wauneta gained the reputation for having the cleanest elevator in the state, Jerry said. Unclean elevators would catch fire, or worse, blow up. He kept the elevator clean, as dust free as possible, but it was nevertheless hard and dirty work and did not pay well, so he quit and looked into the possibility of going to school. Then I.V. Pennington offered him a job and all the training he would need to become a mechanic.


The shop today is an old-fashioned one that doesn’t take new cars. Parts could be machined there, and many of the tools had been manufactured by hand, to accommodate old cars.

Even the cash register was old–as Jerry pointed out, he did not have to close for a power outage, because the register still worked.

It struck me that Jerry McBride had first worked in this shop when the Wauneta elevator was less than ten or fifteen years old and the first annex was new. The repair shop was already old by then. Except for some modern tooling, the shop does not appear to be very different than in the 1960s.

The Waverly, Nebraska elevator is an example of clean lines, efficient design.

Story and photos by Kristen Cart

During my last visit to Nebraska, I stopped by the Waverly, Nebraska elevator complex.  The elevator, built by Tillotson Construction of Omaha, Nebraska, was brighter than the rest, gleaming whitely in the sunshine and standing separately from the others.  Tillotson Construction built this design in several cities, so it was instantly recognizable, even from a distance.  It is a beauty.

The Farmers Cooperative Company operates the elevator.  Colby Woods,  who has worked for the cooperative for four years, currently specializing in agronomy and marketing, showed me the manhole covers. They are stamped “Tillotson Construction Co., 1955, Omaha, Nebr.”   He was happy to share what he knew about the old building.

Colby Woods of Farmers Cooperative Company

As with most of the old concrete elevators I have visited, few employees were still around who could remember when the elevator was new.  But the people who helped me were very interested in the elevator’s history.  It made for a very pleasant visit.

How to build an elevator: Jerry Osborn’s firsthand account from Blencoe, Iowa

Story by Jerry Osborn and photos by Kristen Cart

The summer of 1954, before my senior year, I started working at the Hormel plant again, but after a few weeks my dad asked me to work on the elevator his company, Mayer-Osborn Company, was building at Blencoe, Iowa. This would be a different experience. Since I had no transportation of my own he took me to Blencoe and set me up in a motel near the site. He also took me to a shoe store to buy work shoes so I would be set to go to work. The wages weren’t great. They were $1 an hour just like all the other grunts on the job. No nepotism on this job. My job was to select the correct steel and see that it was laid properly as the slip forms were filled and jacked. Fortunately, I had enough engineering drawing work that I could read the blueprints. The slip operation had just begun when I arrived, so it was learn-on-the-run for me.

Things seemed to be progressing nicely until we were about twenty feet in the air. At that point it was noticed that some of the exposed concrete was crumbling and falling to the ground. This can’t be good. The operation was shut down immediately to determine what the problem was. It became obvious that the mix ratio of cement to sand and gravel was too low. The work to that point had to be torn down. The demolition was done over the weekend, and we were setting up to slip again on Monday. The concrete was mixed on the job and the appropriate mix weights were to be locked into the scales. Somehow the proper amount of cement was not designated. My brother, who had been on a lot of these jobs, was a supervisor on this job and should have checked the setting for the proper mix.

When operating properly, the concrete was mixed next to the elevator; each mix was dumped into a bucket hoist, which was lifted to the deck level. The mud was fed into two-wheel mud buggies. The buggies were then wheeled to and dumped at the place needing concrete. As this process took place another mix was in process, so when the hoist bucket was returned, it was once again filled and the whole process was repeated over and over until a height of more than 100 feet was reached. As the forms were filled, steel was laid and other features such as portholes were laid in place as the forms were jacked upward, exposing freshly set concrete at the bottom of the forms and providing more space at the top for more mud. A scaffold was built below but connected to the forms so men with trowels could smooth the fresh concrete as it was exposed below.

I had hoped to work until the slip was finished, but the restart didn’t leave enough time prior to football practice.

Budd Gauger recalls delivering grain to the Wauneta elevator

Budd Gauger, who was born in 1930, grew up on a farm fifteen miles from Wauneta, in southwestern Nebraska. He went on to have a career as a newspaperman in Lincoln and Toledo. Here, in his lyrical style, he recalls details from his trips to the old Wauneta elevator. Mayer-Osborn’s plans for a new concrete elevator were approved, in 1949, by Farmers Coop Exchange (FCE), which merged with  Frenchman Valley Cooperative in 1990.

By Budd Gauger

Fourth of July means fireworks, but wheat farmers examine their fields hoping no fireworks such as lightning destroy their crops. They have decided to start the harvest.

When?

Now!

♦ ♦ ♦
 

I was assigned by my father to drive the big truck, usually a Chevrolet, hauling wheat to elevators in town. I realized that I had down time or wasted time when sitting in the fields waiting to load or at the elevator waiting to unload, so I enrolled in correspondence courses (this was in the ’50s) from Midland and Dana Colleges. A cousin, Thelma Gauger, taught me some words of shorthand, which came in handy for a journalist conducting an interview of newsmakers, so I sometimes practiced in the truck.

Frenchman Valley Co-op elevator complex at Wauneta. Photo by Gary Rich.

Wheat harvests come quickly and leave quickly on a march from Texas to Manitoba.

If the wheat was dry we could easily go most of the night in the fields. Sometimes I would stretch out atop my “gold” (wheat) in the back of the truck, and look at the soft-friendly of the moon, looking at me and billions of stars.

I marveled at the height of the elevators, not quite skyscraper high, but big nevertheless. They took a sample of wheat to make sure it wasn’t rotten. The price depended on the condition of the kernels.

Dacoma account documents co-op’s contract with Tillotson Construction

The following account comes from the history of the Dacoma, Oklahoma, farmers’ cooperative, which appears on the organization’s website:

The first concrete elevator was constructed in the year 1941 at a cost of $27,700 by Roberts Construction Company with a 100,000-bushel storage capacity. This was the north section of the west elevator. On March 12, 1945, it was voted by the Board to build a new office building. This was just west of the present building.

Adapted from Wikipedia's OK county maps by Set...

Business was now increasing and also the need for additional storage. A second concrete elevator was built in 1948 as an annex to the south of the first, west elevator. This was built at a cost of $52,000 by Roberts Construction Company, increasing storage another 100,000 bushels. In 1949, the authorized capital stock was raised to $100,000. The steel building housing the wheat cleaner and feed storage was built in 1950 for $8,000.

Continuing united efforts of management and membership saw another expansion necessary. In 1954, following a vote of the stockholders, the contract was signed with Tillotson Construction Company for a new 250,000-bushel concrete elevator. This new one to be located to the east of the office at a cost of $138,971. In 1956 the Authorized Capital stock was raised from $100,000 to $600,000.

Tillotson’s Vinton Street shows just how neighborly an elevator can be

Story and Photo by Ronald Ahrens

So many elevators are in small towns that visiting one in a big city is a bracing experience.

Tillotson’s Vinton Street elevator is at the bottom of a hill right in the midst of an Omaha residential neighborhood. The concrete silos stretch two whole blocks from Vinton on the north to Valley Street on the south.

The southernmost of the annexes leans hard against Interstate 80’s westbound lane.

To the east are bungalows and yards and gardens on the downslope from 32nd Street to 34th Street.

And the resident of any of the houses to the west, going uphill from 35th Street, get a whole faceful of imposing grain elevator.

Viewing Tillotson’s Vinton Street elevator from the ground up in Omaha

Story and photos by Ronald Ahrens

One word stays in mind after my May 10 visit to Tillotson Construction Company’s Vinton Street elevator in Omaha: mighty. This elevator exudes mightiness.

The headhouse soars to an exaggerated height, towering above the residential neighborhood and looking down upon Interstate 80, which is just 100 yards to the south. 

The delicately rounded corners present a contrast to the otherwise stalwartly rectilinear character of the tower. From the look of it, I wouldn’t have been surprised to learn there were offices up there: people tapping away at keyboards, making trades, issuing policies.

It looks modern and well-designed and I can imagine how proud the Tillotsons were when they completed it.

I don’t know what year this was built. During my first twenty-one years, which were spent in Omaha, I passed this elevator umpteen times without having any idea that my grandfather’s company had built it.

Now knowing what I do, finding the manhole covers with the company’s name was a thrill.

Not knowing many other things, it would be interesting to learn the answer to questions about the elevator’s various fixtures and appurtenances. What is that big jobbie-do at the very top and when was it set there? Why are the windows located where they are?

Of course the Vinton Street elevator has received national attention because the annexes have become the canvas for a public art project; the nonprofit organization Emerging Terrain has commissioned artists to create themed banners that have been draped over the silos, and in fact a crew was just finishing up the last hanging when I arrived.

It’s a pity to see the elevator in disrepair, and I found myself wishing it would receive some attention, too.

Oh, what a fresh coat of paint and new panes of glass would do for the appearance!

Tillotson Construction adds six feet a day on Elkhart elevator

Elkhart–Construction is starting on the new 225,000 bushel elevator for the Equity Grain Co. here.
The Tillotson Construction Co. of Omaha has the contract.Hutchinson (Kan.) News-Herald, December 24, 1945

From the city of Elkhart’s website. Note elevator silos in upper left.

Work Day and Night on Elkhart Elevator 

Elkhart–Work is proceeding day and night on the construction of the new Equity elevator here.
Floodlights are rigged up to illuminate the scene for the night workers.The concrete storage tanks are going up at the rate of six feet a day. They will stand 140 feet high when completed. The elevator will have a storage of 250,000 bushels of grain.The Tillotson Construction Co. of Omaha, have the contract. It is expected the bins will be finished in three weeks.

Hutchinson (Kan.) News-Herald, March 21, 1946