How to build an elevator: Jerry Osborn’s firsthand account from Blencoe, Iowa

Story by Jerry Osborn and photos by Kristen Cart

The summer of 1954, before my senior year, I started working at the Hormel plant again, but after a few weeks my dad asked me to work on the elevator his company, Mayer-Osborn Company, was building at Blencoe, Iowa. This would be a different experience. Since I had no transportation of my own he took me to Blencoe and set me up in a motel near the site. He also took me to a shoe store to buy work shoes so I would be set to go to work. The wages weren’t great. They were $1 an hour just like all the other grunts on the job. No nepotism on this job. My job was to select the correct steel and see that it was laid properly as the slip forms were filled and jacked. Fortunately, I had enough engineering drawing work that I could read the blueprints. The slip operation had just begun when I arrived, so it was learn-on-the-run for me.

Things seemed to be progressing nicely until we were about twenty feet in the air. At that point it was noticed that some of the exposed concrete was crumbling and falling to the ground. This can’t be good. The operation was shut down immediately to determine what the problem was. It became obvious that the mix ratio of cement to sand and gravel was too low. The work to that point had to be torn down. The demolition was done over the weekend, and we were setting up to slip again on Monday. The concrete was mixed on the job and the appropriate mix weights were to be locked into the scales. Somehow the proper amount of cement was not designated. My brother, who had been on a lot of these jobs, was a supervisor on this job and should have checked the setting for the proper mix.

When operating properly, the concrete was mixed next to the elevator; each mix was dumped into a bucket hoist, which was lifted to the deck level. The mud was fed into two-wheel mud buggies. The buggies were then wheeled to and dumped at the place needing concrete. As this process took place another mix was in process, so when the hoist bucket was returned, it was once again filled and the whole process was repeated over and over until a height of more than 100 feet was reached. As the forms were filled, steel was laid and other features such as portholes were laid in place as the forms were jacked upward, exposing freshly set concrete at the bottom of the forms and providing more space at the top for more mud. A scaffold was built below but connected to the forms so men with trowels could smooth the fresh concrete as it was exposed below.

I had hoped to work until the slip was finished, but the restart didn’t leave enough time prior to football practice.

Searching for Mayer-Osborn’s office in Denver produces a good possibility

Story and illustration by Kristen Osborn Cart

Looking for the original offices my grandfather used while putting up elevators for a living, I checked maps for the buildings that stood at the old Mayer-Osborn Company addresses. Google gives a bird’s-eye view. The newer address at 5100 York, in Denver, has no building and seems to be a parking lot full of junker cars and abandoned trailers. There is a small white cinderblock-looking building next door that might be that old, but it is nothing to speak of. I am sure the old building where William Osborn and his partner Gene Mayer located their business is long gone.

The address at 1717 E. Colfax has a handsome, two-toned, tan-and-brown brick building, three stories high, with a glass-brick corner feature on each floor and a style very like some of the better buildings from the Forties and Fifties. It has white-framed windows. It looks like it could have been newly built, if it was their office back then. A mural painted on the side looks like old Nebraska historical scenes, and a canvas awning shades the entry.

If I were any good at all at remembering architectural terminology from my college art history class, you would have a pretty good idea what it looks like just from my description.

Alas, there’s no way of knowing from a photo exactly when it was built, and whether Mayer-Osborn set up there in the old office of Holmen and Mayer, but I suspect so. The building would have made a very presentable impression on clients who came in looking for a reputable, established elevator construction company.

 


Budd Gauger recalls delivering grain to the Wauneta elevator

Budd Gauger, who was born in 1930, grew up on a farm fifteen miles from Wauneta, in southwestern Nebraska. He went on to have a career as a newspaperman in Lincoln and Toledo. Here, in his lyrical style, he recalls details from his trips to the old Wauneta elevator. Mayer-Osborn’s plans for a new concrete elevator were approved, in 1949, by Farmers Coop Exchange (FCE), which merged with  Frenchman Valley Cooperative in 1990.

By Budd Gauger

Fourth of July means fireworks, but wheat farmers examine their fields hoping no fireworks such as lightning destroy their crops. They have decided to start the harvest.

When?

Now!

♦ ♦ ♦
 

I was assigned by my father to drive the big truck, usually a Chevrolet, hauling wheat to elevators in town. I realized that I had down time or wasted time when sitting in the fields waiting to load or at the elevator waiting to unload, so I enrolled in correspondence courses (this was in the ’50s) from Midland and Dana Colleges. A cousin, Thelma Gauger, taught me some words of shorthand, which came in handy for a journalist conducting an interview of newsmakers, so I sometimes practiced in the truck.

Frenchman Valley Co-op elevator complex at Wauneta. Photo by Gary Rich.

Wheat harvests come quickly and leave quickly on a march from Texas to Manitoba.

If the wheat was dry we could easily go most of the night in the fields. Sometimes I would stretch out atop my “gold” (wheat) in the back of the truck, and look at the soft-friendly of the moon, looking at me and billions of stars.

I marveled at the height of the elevators, not quite skyscraper high, but big nevertheless. They took a sample of wheat to make sure it wasn’t rotten. The price depended on the condition of the kernels.

Dacoma account documents co-op’s contract with Tillotson Construction

The following account comes from the history of the Dacoma, Oklahoma, farmers’ cooperative, which appears on the organization’s website:

The first concrete elevator was constructed in the year 1941 at a cost of $27,700 by Roberts Construction Company with a 100,000-bushel storage capacity. This was the north section of the west elevator. On March 12, 1945, it was voted by the Board to build a new office building. This was just west of the present building.

Adapted from Wikipedia's OK county maps by Set...

Business was now increasing and also the need for additional storage. A second concrete elevator was built in 1948 as an annex to the south of the first, west elevator. This was built at a cost of $52,000 by Roberts Construction Company, increasing storage another 100,000 bushels. In 1949, the authorized capital stock was raised to $100,000. The steel building housing the wheat cleaner and feed storage was built in 1950 for $8,000.

Continuing united efforts of management and membership saw another expansion necessary. In 1954, following a vote of the stockholders, the contract was signed with Tillotson Construction Company for a new 250,000-bushel concrete elevator. This new one to be located to the east of the office at a cost of $138,971. In 1956 the Authorized Capital stock was raised from $100,000 to $600,000.

Tillotson’s Vinton Street shows just how neighborly an elevator can be

Story and Photo by Ronald Ahrens

So many elevators are in small towns that visiting one in a big city is a bracing experience.

Tillotson’s Vinton Street elevator is at the bottom of a hill right in the midst of an Omaha residential neighborhood. The concrete silos stretch two whole blocks from Vinton on the north to Valley Street on the south.

The southernmost of the annexes leans hard against Interstate 80’s westbound lane.

To the east are bungalows and yards and gardens on the downslope from 32nd Street to 34th Street.

And the resident of any of the houses to the west, going uphill from 35th Street, get a whole faceful of imposing grain elevator.

Viewing Tillotson’s Vinton Street elevator from the ground up in Omaha

Story and photos by Ronald Ahrens

One word stays in mind after my May 10 visit to Tillotson Construction Company’s Vinton Street elevator in Omaha: mighty. This elevator exudes mightiness.

The headhouse soars to an exaggerated height, towering above the residential neighborhood and looking down upon Interstate 80, which is just 100 yards to the south. 

The delicately rounded corners present a contrast to the otherwise stalwartly rectilinear character of the tower. From the look of it, I wouldn’t have been surprised to learn there were offices up there: people tapping away at keyboards, making trades, issuing policies.

It looks modern and well-designed and I can imagine how proud the Tillotsons were when they completed it.

I don’t know what year this was built. During my first twenty-one years, which were spent in Omaha, I passed this elevator umpteen times without having any idea that my grandfather’s company had built it.

Now knowing what I do, finding the manhole covers with the company’s name was a thrill.

Not knowing many other things, it would be interesting to learn the answer to questions about the elevator’s various fixtures and appurtenances. What is that big jobbie-do at the very top and when was it set there? Why are the windows located where they are?

Of course the Vinton Street elevator has received national attention because the annexes have become the canvas for a public art project; the nonprofit organization Emerging Terrain has commissioned artists to create themed banners that have been draped over the silos, and in fact a crew was just finishing up the last hanging when I arrived.

It’s a pity to see the elevator in disrepair, and I found myself wishing it would receive some attention, too.

Oh, what a fresh coat of paint and new panes of glass would do for the appearance!

We visit the former Omaha office of Tillotson Construction Company

By Ronald Ahrens

On May 10, I was in Omaha with my camera. One objective was to visit the former office of Tillotson Construction Company. Uncle Tim Tillotson had recently tipped me off to this, saying he helped move out the company’s papers after Reginald’s death.

“Twelfth and Jones–the Office, the OFFICE!” he said.

I parked at 13th and Jones in the southern part of the Old Market area and walked across the intersection. In just a few more steps to the east I knew exactly what he was talking about.

It turns out, the Office was part of an Anheuser-Busch plant of four buildings erected in 1887. Besides the Office, designed in Romanesque style, there was a bottling facility, a beer storage warehouse, and a stable. The other three buildings were torn down, but the Office survives.

One hundred and one years after the Office went up, a finial above the doorway blew down during a windstorm. It was stolen and has never been recovered.

Tillotson Construction adds six feet a day on Elkhart elevator

Elkhart–Construction is starting on the new 225,000 bushel elevator for the Equity Grain Co. here.
The Tillotson Construction Co. of Omaha has the contract.Hutchinson (Kan.) News-Herald, December 24, 1945

From the city of Elkhart’s website. Note elevator silos in upper left.

Work Day and Night on Elkhart Elevator 

Elkhart–Work is proceeding day and night on the construction of the new Equity elevator here.
Floodlights are rigged up to illuminate the scene for the night workers.The concrete storage tanks are going up at the rate of six feet a day. They will stand 140 feet high when completed. The elevator will have a storage of 250,000 bushels of grain.The Tillotson Construction Co. of Omaha, have the contract. It is expected the bins will be finished in three weeks.

Hutchinson (Kan.) News-Herald, March 21, 1946

Elkhart farmers ‘raise sights,’ hire Tillotson Construction on new elevator

Photo taken March 19, 2011, by Kate Flint.

Stockholders of the Cooperative Equity Exchange here have raised their sights. Instead of the 100,000 bushel elevator first planned, the stockholders have voted in favor of erecting a modern elevator of 225,000 bushels capacity.

The contract has been let to the Tillotson Construction Co. of Omaha. It will be built on a “cost plus” basis, but Gale Cochran, manager of the Equity said it was estimated it would cost around $85,000.

There will be eight overhead bins, six interstice bins and eight grain tanks. The elevator head will stand 120 feet high. The plant will be built at the site of the old Elkhart mill, purchased from J.E. Heintz. The present elevator buildings will be sold.

Construction will be started in about two weeks, and the new plant is to be completed before harvest next summer.

Hutchinson (Kan.) News-Herald, November 20, 1945

♦ ♦ ♦

Note: Here’s the link to the BNSF railroad’s grain elevator index page on Elkhart.

Additional note: University of Southern California professor Kate Flint chased grain elevators in March 2011 and even stayed in one overnight.

Marvin Richards falls 105 feet from Hinton elevator

Iowan Killed in Fall from Grain Elevator

Sioux City (AP) — Marvin Richards, 28, of Hinton died in a hospital here Friday shortly after he had fallen 105 feet from the top of a grain elevator at Hinton.

Richards was employed by the Tillotson Construction Company of Omaha. He was working on a scaffold atop the nearly completed elevator of the Farmers Elevator Company.

He apparently lost his balance and fell 105 feet to the concrete top of a hopper.

Cedar Rapids Gazette, October 1, 1954

♦ ♦ ♦

Special note: The obituary of Mr. Richards’s sister Deloris E. Holtz.

News of recent developments in Hinton are found on Younglove’s site, including a picture of the original elevator.